create account

Learn With Me: Procurement in Constrcution by dante31

View this thread on: hive.blogpeakd.comecency.com
· @dante31 ·
$3.92
Learn With Me: Procurement in Constrcution
![image.png](https://files.peakd.com/file/peakd-hive/dante31/23uQtWHXxFj8i5TwKk1xivDVn7rQuqpwUbSRUHLfcqGUEbiGMBn5ZpCtGpwxM4mPCqduT.jpg)
<sup>[Photo by Anamul Rezwan from Pexels](https://www.pexels.com/photo/two-man-holding-white-paper-1216589/)</sup>


### What Does Construction Procurement Entail?

The process of obtaining materials, labour, and other services from an outside source for a building project is referred to as procurement in the industry. This procedure entails determining the project's requirements, choosing suppliers and contractors, settling on a contract, and overseeing the delivery and payment of the goods and services. In the construction industry, procurement aims to find the greatest deal on the labour and supplies while making sure the project is finished on schedule and on budget.




### Construction Procurement And Supply Chain

The processes of purchasing goods, services, and works from outside sources and controlling the flow of resources and labour to a construction project are referred to as procurement and supply chain management in the industry. Identifying project needs, choosing suppliers and contractors, negotiating contracts, and overseeing the delivery and payment of the goods and services are all parts of the procurement process. Transport, storage, and inventory management are all part of supply chain management, which entails coordinating and controlling the movement of products and manpower from suppliers to the construction site.

In order to execute the project on schedule and within budget, procurement and supply chain management in the construction industry aim to get the best deal on the essential supplies and labour. Cost reductions, higher project quality, and greater efficiency can all be attained through efficient supply chain and procurement management. Due to the numerous parties involved, the substantial number of supplies and labour required, and the requirement to work in concert with the building timetable, it can be a complicated procedure.

### Procurement Techniques

Various procurement methods can be employed in the construction industry, depending on the particular requirements of the project. The following are a some of the most popular procurement tactics:

The most conventional form of procurement is known as design-bid-build, in which the design is finished before the project is advertised for bids. For smaller projects or those where the design is already well-established, this method is frequently adopted.

Design-build procurement: In this method, the contractor is in charge of both the project's design and construction. Cost reductions and better coordination between the design and construction phases can result from this strategy.

Construction management: In this approach, the owner and the construction manager collaborate to plan, design, and build the project. The construction manager serves as the owner's counsel and is in charge of organising the efforts of the numerous contractors.

Integrated project delivery: In order to ensure that all project elements are integrated and coordinated, this technique entails the owner, designers, and contractors working together from the outset of the project.

Public-Private Partnership: This method entails cooperation between the public and private sectors, in which the former are in charge of project financing, design, construction, and operation, and the latter are in charge of providing the necessary land, permits, and other permissions.

The exact requirements of the project and the project owner's objectives, especially those related to cost, time, and quality, will determine the procurement strategy to be used. The complexity of the project, the level of design generated, the level of innovation required, and other project-specific criteria will be taken into consideration while selecting the best strategy.
👍  , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
properties (23)
authordante31
permlinklearn-with-me-procurement-in-constrcution
categoryhive-153850
json_metadata{"app":"peakd/2023.1.1","format":"markdown","tags":["stemsocial","proofofbrain","palnet","neoxian","lassecash","creativecoin"],"users":[],"image":["https://files.peakd.com/file/peakd-hive/dante31/23uQtWHXxFj8i5TwKk1xivDVn7rQuqpwUbSRUHLfcqGUEbiGMBn5ZpCtGpwxM4mPCqduT.jpg"]}
created2023-01-18 15:44:42
last_update2023-01-18 15:44:42
depth0
children1
last_payout2023-01-25 15:44:42
cashout_time1969-12-31 23:59:59
total_payout_value1.962 HBD
curator_payout_value1.956 HBD
pending_payout_value0.000 HBD
promoted0.000 HBD
body_length3,896
author_reputation68,713,017,036,742
root_title"Learn With Me: Procurement in Constrcution"
beneficiaries[]
max_accepted_payout1,000,000.000 HBD
percent_hbd10,000
post_id119,983,552
net_rshares7,240,769,086,315
author_curate_reward""
vote details (33)
@hivebuzz ·
Congratulations @dante31! You have completed the following achievement on the Hive blockchain And have been rewarded with New badge(s)

<table><tr><td><img src="https://images.hive.blog/60x70/http://hivebuzz.me/@dante31/comments.png?202301181552"></td><td>You made more than 4000 comments.<br>Your next target is to reach 4500 comments.</td></tr>
</table>

<sub>_You can view your badges on [your board](https://hivebuzz.me/@dante31) and compare yourself to others in the [Ranking](https://hivebuzz.me/ranking)_</sub>
<sub>_If you no longer want to receive notifications, reply to this comment with the word_ `STOP`</sub>


To support your work, I also upvoted your post!


**Check out our last posts:**
<table><tr><td><a href="/hive-139531/@hivebuzz/proposal-2324"><img src="https://images.hive.blog/64x128/https://i.imgur.com/RNIZ1N6.png"></a></td><td><a href="/hive-139531/@hivebuzz/proposal-2324">The Hive Gamification Proposal Renewal</a></td></tr></table>

###### Support the HiveBuzz project. [Vote](https://hivesigner.com/sign/update_proposal_votes?proposal_ids=%5B%22248%22%5D&approve=true) for [our proposal](https://peakd.com/me/proposals/248)!
properties (22)
authorhivebuzz
permlinknotify-dante31-20230118t155731
categoryhive-153850
json_metadata{"image":["http://hivebuzz.me/notify.t6.png"]}
created2023-01-18 15:57:30
last_update2023-01-18 15:57:30
depth1
children0
last_payout2023-01-25 15:57:30
cashout_time1969-12-31 23:59:59
total_payout_value0.000 HBD
curator_payout_value0.000 HBD
pending_payout_value0.000 HBD
promoted0.000 HBD
body_length1,155
author_reputation369,855,999,545,697
root_title"Learn With Me: Procurement in Constrcution"
beneficiaries[]
max_accepted_payout1,000,000.000 HBD
percent_hbd10,000
post_id119,983,841
net_rshares0