create account

4 Ways to save money with a power system analysis at your pulp and paper mill by jmkengineering

View this thread on: hive.blogpeakd.comecency.com
· @jmkengineering ·
$4.97
4 Ways to save money with a power system analysis at your pulp and paper mill
<center>https://jmkengineering.com/wp-content/uploads/2016/05/AdobeStock75163797.jpeg</center> <br/><img class="size-large wp-image-1561" src="https://sparkyresource.com/wp-content/uploads/2016/05/AdobeStock75163797-1024x683.jpeg" alt="Paper Mill" width="1024" height="683" /><br/>
Sometimes it seems that the number of requirements for running a plant keeps going up, and regulations keep changing cutting into the bottom line. This is how a lot of clients I have worked with in the past have approached getting a power system analysis completed, they needed labels on their equipment to satisfy the requirements of <a href="http://jmkengineering.com/csa-z462-law/">CSA Z462</a> and NFPA 70E, so they needed an arc flash study. It was an expense, nothing more.
However, if you define the scope (the first step in <a href="http://jmkengineering.com/steps-to-complete-a-power-system-analysis/">performing a power system analysis</a>) smartly, you can duplicate effort without duplicating cost, and use the report to make smart decisions that will either save money immediately or identify capital projects with very fast payback.
<h2>1. Reduced number of Electrical Safety Incidents</h2>
According to NFPA (<a href="https://www.google.ca/url?sa=t&amp;rct=j&amp;q=&amp;esrc=s&amp;source=web&amp;cd=2&amp;ved=0ahUKEwiAou2ui9zMAhUGGD4KHRkgBccQFghGMAE&amp;url=http%3A%2F%2Fwww.nfpa.org%2F~%2Fmedia%2Ffiles%2Fresearch%2Fresearch-foundation%2Fresearch-foundation-reports%2Felectrical%2Frfarcflashoccdata.pdf%3Fla%3Den&amp;usg=AFQjCNHf1s6TaKFYYI3izPpYZjk2xkMVLA&amp;sig2=RQ1AyN_R2ig9mhiDPDAAUw" target="_blank">source-pdf</a>) the average shock or arc flash injury event can cost $80k in direct costs, if indirect costs are included this can be much higher. However, according to that same paper there are no valid ratios to estimate this.
With a power system analysis in hand, an effective electrical safety program can be developed that will directly affect the number of these incidents. The number of these incidents are typically very low, however the high cost of a single incident will pay for the power system analysis and electrical safety program many times over.
<h2>2. Better preventative maintenance program</h2>
<div class="pull-right"><img class="alignright wp-image-1560 size-medium" src="https://sparkyresource.com/wp-content/uploads/2016/05/AdobeStock65917445-300x200.jpeg" alt="Motor with pump industry in factory" width="300" height="200" /></div><br/>
Competitive pulp and paper mills have at least a preventative maintenance program, and a lot are moving to a predictive maintenance program. The most important part of these programs, like a valid power system analysis, is the quality of input data. When going through the process of validating all the input data for a <a href="http://jmkengineering.com/services/power-system-analysis/">power system analysis</a>, it would be a simple matter of gathering the information for your maintenance program without duplicating effort. It is likely the same staff that will be doing the work in anycase.
With better information, including short circuit values, expected load flow voltages, etc, you can feed this information into the maintenance program and understand when equipment may fail, allowing you to plan its replacement without affecting the process.
<h2>3. Power Quality Improvements</h2>
When going through the system and gathering all the necessary input data for the incident energy study, you have all the inputs for proper load flow study, and all you need is some existing load information that can be gleaned from the power meters throughout your mill.
This is where you will see an opportunity to get the most value from the power system analysis. Like most industrial plants you are likely charged:
<ul>
<li>a energy fee (MW-HR),</li>
<li>a peak charge (rolling MW) and</li>
<li>sometimes a power factor charge.</li>
</ul>
You can minimize your power factor and energy fees by making sure that you are running your system as close to unity power factor as possible. With a proper power flow study, you will be able to identify areas within you plant that would be best suited for adding power factor correction capacitors and quickly identify the potential payback.
<h2>4. Update Drawings of the System</h2>
Finally, and likely an over-looked part, is that you will have updated drawings as part of your power system analysis that are very accurate, current, as-built conditions. These drawings are now trusted inputs for any capital or maintenance projects that may take place in the future.
<div class="pull-right"><img class="alignright size-medium wp-image-1258" src="https://sparkyresource.com/wp-content/uploads/2016/01/IMG0004-e1454076551125-300x185.jpg" alt="IMG_0004" width="300" height="185" /></div><br/>One of the biggest risks to integrating into any existing system, is the quality of the existing documents, and the cost of having a consultant on site developing as-built drawings will increase the cost of a small project quickly. Having these drawings on hand, and assuming you have a document control procedure in place, the consultant replacing a motor or adding a new system will have the best information starting, reducing the design time, construction issues, and start-up concerns.
<h2>Next Steps</h2>
If you like what you read consider joining our <a href="http://jmkengineering.com/newsletter/">newsletter</a> where you will get every post in your inbox at the start of the month. You will never miss a thing.  If you would like to learn more about how a power system analysis can help you manage your system better and safer, contact us here, or visit our <a href="http://jmkengineering.com/services/power-system-analysis/">services</a> page here.
And if there is someone you think would benefit from this post we appreciate any share on <a href="https://www.facebook.com/JeffMacKinnon.JMKEngineering">facebook</a>, <a href="https://www.linkedin.com/company/jmk-engineering-inc-/">linkedin</a> or the old fashioned email. <br><br><br><center><b>Posted from our blog at https://jmkengineering.com/money-with-a-power-system-analysis-pulp-and-paper-mill/.
<br /><br />
If you like this article and want to hear more sign up for our newsletter at <a href="http://jmkengineering.com/newsletter/">jmkengineering.com/newsletter</a>

</b></center>  
👍  , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , and 267 others
properties (23)
authorjmkengineering
permlink4waystosavemoneywithapowersystemanalysisatyourpulpandpapermill-ayg350fw8f
categoryengineering
json_metadata{"community":"steempress","app":"steempress","image":[""],"tags":["engineering","arcflashstudy","electricpowersystem","electricalsafetyprogram","incidentenergystudy"],"canonical_url":"https://jmkengineering.com/money-with-a-power-system-analysis-pulp-and-paper-mill/"}
created2020-05-25 12:40:03
last_update2020-05-25 12:40:03
depth0
children2
last_payout2020-06-01 12:40:03
cashout_time1969-12-31 23:59:59
total_payout_value2.312 HBD
curator_payout_value2.660 HBD
pending_payout_value0.000 HBD
promoted0.000 HBD
body_length6,351
author_reputation7,327,516,810,836
root_title"4 Ways to save money with a power system analysis at your pulp and paper mill"
beneficiaries
0.
accountsteempress
weight1,500
max_accepted_payout1,000,000.000 HBD
percent_hbd10,000
post_id97,579,397
net_rshares12,036,080,766,930
author_curate_reward""
vote details (331)
@hivebuzz ·
Congratulations @jmkengineering! You have completed the following achievement on the Hive blockchain and have been rewarded with new badge(s) :

<table><tr><td><img src="https://images.hive.blog/60x60/http://hivebuzz.me/badges/postallweek.png"></td><td>You are a buzzy bee and published a post every day of the week</td></tr>
</table>

<sub>_You can view [your badges on your board](https//hivebuzz.me/@jmkengineering) And compare to others on the [Ranking](https://hivebuzz.me/ranking)_</sub>
<sub>_If you no longer want to receive notifications, reply to this comment with the word_ `STOP`</sub>


To support your work, I also upvoted your post!
properties (22)
authorhivebuzz
permlinkhivebuzz-notify-jmkengineering-20200525t130250000z
categoryengineering
json_metadata{"image":["http://hivebuzz.me/notify.t6.png"]}
created2020-05-25 13:02:48
last_update2020-05-25 13:02:48
depth1
children0
last_payout2020-06-01 13:02:48
cashout_time1969-12-31 23:59:59
total_payout_value0.000 HBD
curator_payout_value0.000 HBD
pending_payout_value0.000 HBD
promoted0.000 HBD
body_length648
author_reputation367,965,817,754,659
root_title"4 Ways to save money with a power system analysis at your pulp and paper mill"
beneficiaries[]
max_accepted_payout1,000,000.000 HBD
percent_hbd10,000
post_id97,579,761
net_rshares0
@steemstem ·
re-jmkengineering-4waystosavemoneywithapowersystemanalysisatyourpulpandpapermill-ayg350fw8f-20200525t234823183z
<div class='text-justify'> <div class='pull-left'>
 <img src='https://stem.openhive.network/images/stemsocialsupport7.png'> </div>

Thanks for your contribution to the STEMsocial community. Feel free to join us on discord to get to know the rest of us!

Please consider <a href="https://hivesigner.com/sign/update-proposal-votes?proposal_ids=%5B91%5D&amp;approve=true">supporting our funding proposal</a>, <a href="https://hivesigner.com/sign/account_witness_vote?approve=1&witness=stem.witness">approving our witness</a> (@stem.witness) or delegating to the @steemstem account (for some ROI).

Please consider using the <a href='https://stem.openhive.network'>STEMsocial app</a> app and including @stemsocial as a beneficiary to get a stronger support.&nbsp;<br />&nbsp;<br />
properties (22)
authorsteemstem
permlinkre-jmkengineering-4waystosavemoneywithapowersystemanalysisatyourpulpandpapermill-ayg350fw8f-20200525t234823183z
categoryengineering
json_metadata{"app":"stemsocial"}
created2020-05-25 23:48:24
last_update2020-05-25 23:48:24
depth1
children0
last_payout2020-06-01 23:48:24
cashout_time1969-12-31 23:59:59
total_payout_value0.000 HBD
curator_payout_value0.000 HBD
pending_payout_value0.000 HBD
promoted0.000 HBD
body_length777
author_reputation262,017,435,115,313
root_title"4 Ways to save money with a power system analysis at your pulp and paper mill"
beneficiaries[]
max_accepted_payout1,000,000.000 HBD
percent_hbd10,000
post_id97,589,033
net_rshares0