create account

Why is it important to calculate the corrected exponent d when drilling an oil well? by carlos84

View this thread on: hive.blogpeakd.comecency.com
· @carlos84 ·
$2.59
Why is it important to calculate the corrected exponent d when drilling an oil well?
<div class="text-justify">

![image.png](https://images.hive.blog/DQmeEjZmqGpkd2QkKfW5WFfh53LsxAickgwWPE5sXRLsziV/image.png)
[Image source](https://en.wikipedia.org/wiki/File:Inside_a_Mud_Logging_cabin.jpg)

There is a very important mathematical calculation in the oil industry when drilling an oil well, which must be taken into account by petroleum engineers when evaluating pressures. This mathematical calculation is called the corrected d exponent, a parameter that, once calculated, is widely used in mud logging activities and pore pressure analysis.

Mathematically speaking, the corrected d-factor is an extrapolation of certain drilling parameters such as:

- Drilling speed (ROP).
- Revolutions per minute of the drill string (RPM).
- Weight on the drill bit (WOB).
- Diameter of the drill bit (D).
- Drilling fluid density. 

Although the pore pressure of the producing reservoir is previously estimated, being able to calculate this corrected exponent d allows us to estimate the value of a pressure gradient for the constant evaluation of the pore pressure of the producing reservoir while we are drilling. 

All this is done because there are oil fields with very high pore pressures (overpressurized) that must be monitored in real time, and what better way to do this than to estimate it using the corrected d exponent. 

This is a mathematical correlation that is already calculated in the exploratory phase, but it is improved with real data from real-time well drilling parameters, hence its name, corrected d exponent. 

Drilling rate (ROP) is a very conclusive drilling parameter in how the calculation of the corrected d exponent can vary, since the way in which the lithological formations and the fluids contained in them are found makes it easier or more difficult to drill and, therefore, to estimate pore pressure in real time. 

### ***Calculation of the corrected exponent d (dc)***

<p>

If the density of the drilling fluid is constant, i.e., it does not require changes, then dc is equal to:

<CENTER>![image.png](https://images.hive.blog/DQmaFtybeZYAnujER8uQi22N7BaPxPMFT9VZxnzCb5bp5rt/image.png)</CENTER>

Where:

R: Drilling speed measured in feet/hour.
N: Rotation speed of the drill string measured in revolutions per minute (RPM).
W: Weight on the drill bit measured in kilolbs. 
D: Diameter of the drill bit measured in inches. 

If the fluid density warrants changes, for example, if the drilling fluid density needs to be increased, then the same equation is used, only multiplied by the ratio between the original density and the new required density.

### ***Example of calculation of the corrected exponent d***

<p>

An oil well is being drilled at a rate of 60 feet per hour (ROP). The rotation speed is 100 RPM. The weight on the drill bit is 15 KLb. The diameter of the drill bit is 8.5 inches. 

Data:

R: 60
N: 100
W: 15
D: 8.5

The solution is to apply the following equation:


![image.png](https://images.hive.blog/DQmQo3Kmj8TEC2TTtJ1y4NkwRQJfvwyFzwRhHHc6Z55S9bX/image.png)

For example, if you want to change a mud density from 9 lbs/gallon to 12 lbs/gallon, then the dc would be:


<center>![image.png](https://images.hive.blog/DQmbE4PUekmqsP8AVbch1B4Rtsm5J5DuADHTeYFqYgLx1Dh/image.png)</center>

Where:

dc: corrected exponent d with variable mud density.
d: corrected exponent d with constant mud density.
Do: original mud density.
Dn: new mud density.

![image.png](https://images.hive.blog/DQmZH5ke95w1EtiFVm2qjVgtHLZaY247v5LcAE74jCYYtmX/image.png)

In conclusion, the corrected d exponent gives us an idea of whether there are abnormal pressures in the reservoir we are drilling. However, it is important that if there is any change in the value of the corrected d exponent, a correct analysis can be performed based on the lithological characteristics of the area where the well is being drilled.   

### ***References***

<p>

- Jorden, J.R. and Shirley, O.J.: "Application of Drilling Performance Data to Overpressure Detection", Journal of Petroleum Technology, p1387-1394, Vol.18, No.11, Nov 1966.

- (2010). Well Control for Completions and Interventions. 1st ed. Texas: Gulf Publishing.

</div>
👍  , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , and 171 others
properties (23)
authorcarlos84
permlinkwhy-is-it-important-to-calculate-the-corrected-exponent-d-when-drilling-an-oil-well
categoryhive-163521
json_metadata{"tags":["stemsocial","stem","neoxian","creativecoin","palnet","engineering"],"image":["https://images.hive.blog/DQmeEjZmqGpkd2QkKfW5WFfh53LsxAickgwWPE5sXRLsziV/image.png","https://images.hive.blog/DQmaFtybeZYAnujER8uQi22N7BaPxPMFT9VZxnzCb5bp5rt/image.png","https://images.hive.blog/DQmQo3Kmj8TEC2TTtJ1y4NkwRQJfvwyFzwRhHHc6Z55S9bX/image.png","https://images.hive.blog/DQmbE4PUekmqsP8AVbch1B4Rtsm5J5DuADHTeYFqYgLx1Dh/image.png","https://images.hive.blog/DQmZH5ke95w1EtiFVm2qjVgtHLZaY247v5LcAE74jCYYtmX/image.png"],"links":["https://en.wikipedia.org/wiki/File:Inside_a_Mud_Logging_cabin.jpg"],"app":"hiveblog/0.1","format":"markdown"}
created2025-08-10 22:27:15
last_update2025-08-10 22:27:15
depth0
children2
last_payout2025-08-17 22:27:15
cashout_time1969-12-31 23:59:59
total_payout_value1.308 HBD
curator_payout_value1.282 HBD
pending_payout_value0.000 HBD
promoted0.000 HBD
body_length4,163
author_reputation373,299,986,150,832
root_title"Why is it important to calculate the corrected exponent d when drilling an oil well?"
beneficiaries[]
max_accepted_payout1,000,000.000 HBD
percent_hbd10,000
post_id144,871,448
net_rshares8,552,635,729,141
author_curate_reward""
vote details (235)
@hivebuzz ·
Congratulations @carlos84! You have completed the following achievement on the Hive blockchain And have been rewarded with New badge(s)

<table><tr><td><img src="https://images.hive.blog/60x70/https://hivebuzz.me/@carlos84/upvotes.png?202508112040"></td><td>You distributed more than 37000 upvotes.<br>Your next target is to reach 38000 upvotes.</td></tr>
</table>

<sub>_You can view your badges on [your board](https://hivebuzz.me/@carlos84) and compare yourself to others in the [Ranking](https://hivebuzz.me/ranking)_</sub>
<sub>_If you no longer want to receive notifications, reply to this comment with the word_ `STOP`</sub>

properties (22)
authorhivebuzz
permlinknotify-1754944994
categoryhive-163521
json_metadata{"image":["https://hivebuzz.me/notify.t6.png"]}
created2025-08-11 20:43:15
last_update2025-08-11 20:43:15
depth1
children0
last_payout2025-08-18 20:43:15
cashout_time1969-12-31 23:59:59
total_payout_value0.000 HBD
curator_payout_value0.000 HBD
pending_payout_value0.000 HBD
promoted0.000 HBD
body_length633
author_reputation369,455,233,493,370
root_title"Why is it important to calculate the corrected exponent d when drilling an oil well?"
beneficiaries[]
max_accepted_payout1,000,000.000 HBD
percent_hbd10,000
post_id144,907,344
net_rshares0
@stemsocial ·
re-carlos84-why-is-it-important-to-calculate-the-corrected-exponent-d-when-drilling-an-oil-well-20250811t024629634z
<div class='text-justify'> <div class='pull-left'>
 <img src='https://stem.openhive.network/images/stemsocialsupport7.png'> </div>

Thanks for your contribution to the <a href='/trending/hive-196387'>STEMsocial community</a>. Feel free to join us on <a href='https://discord.gg/9c7pKVD'>discord</a> to get to know the rest of us!

Please consider delegating to the @stemsocial account (85% of the curation rewards are returned).

Consider setting @stemsocial as a beneficiary of this post's rewards if you would like to support the community and contribute to its mission of promoting science and education on Hive.&nbsp;<br />&nbsp;<br />
</div>
properties (22)
authorstemsocial
permlinkre-carlos84-why-is-it-important-to-calculate-the-corrected-exponent-d-when-drilling-an-oil-well-20250811t024629634z
categoryhive-163521
json_metadata{"app":"STEMsocial"}
created2025-08-11 02:46:30
last_update2025-08-11 02:46:30
depth1
children0
last_payout2025-08-18 02:46:30
cashout_time1969-12-31 23:59:59
total_payout_value0.000 HBD
curator_payout_value0.000 HBD
pending_payout_value0.000 HBD
promoted0.000 HBD
body_length646
author_reputation22,933,079,831,358
root_title"Why is it important to calculate the corrected exponent d when drilling an oil well?"
beneficiaries[]
max_accepted_payout1,000,000.000 HBD
percent_hbd10,000
post_id144,879,680
net_rshares0